Tag Archives: modeling

6 Months Later: An Update on the Comprehensive Study

On Sept. 18 we commenced the Second Interim of the Savannah River Basin Comprehensive Study, bringing us six months into the process. In this post, I hope to provide a brief update on the progress as well as shed some … Continue reading

Posted in Drought Response, Studies, Water Management | Tagged , , , , , , , , , , , , , , , , , , , , , , , | 9 Comments

Why do we need a study on the winter drawdown?

We often hear people suggest the Corps should limit the amount of winter-draw down to 2 feet instead of four. They point out that when Thurmond Dam and Lake were built, a 4-foot winter drawdown was established to make room … Continue reading

Posted in Flood Risk Management, Studies, Water Management | Tagged , , , , , , , , , , , , , , , , , | 12 Comments