Subscribe
-
Recent Posts
Categories
- coronavirus
- coronavirus
- covid19
- CSS Georgia
- Declaration/Projection
- Dissolved oxygen
- Drought in the News
- Drought Response
- Fish and Wildlife
- Flood Risk Management
- From the Commander
- Guest Author
- Hydropower
- Jekyll Creek
- Navigation
- New Savannah Bluff Lock & Dam
- NPLD
- Rainfall Update
- Recreation
- Savannah Harbor
- SHEP
- Studies
- Uncategorized
- Videos
- Water Management
- Water Quality/Water Supply
- Water Safety
- WRO
- WRO
Archives
meta
Tag Archives: comp study
Comp Study ends: Water quality, other concerns, leave drought plan unchanged
Officials here ended the second interim of the Savannah River Basin Comprehensive Study due to inadequate analysis, a lack of full partnership concurrence on the recommendation and insufficient funding.
6 Months Later: An Update on the Comprehensive Study
On Sept. 18 we commenced the Second Interim of the Savannah River Basin Comprehensive Study, bringing us six months into the process. In this post, I hope to provide a brief update on the progress as well as shed some … Continue reading
Posted in Drought Response, Studies, Water Management
Tagged alternatives, Army Corps of Engineers, comp study, comprehensive study, data, drought, Drought Level 3, Georgia Environmental Protection Division, Hartwell Dam, Hartwell Lake, J. Strom Thurmond Lake, modeling, report, Richard B. Russell Lake, Russell Lake, Savannah District, Savannah River, Savannah River Basin, study, Thurmond Dam, Thurmond Lake, US Army Corps of Engineers, USACE, water management
9 Comments
Corps water manager gives update on basin comprehensive study
In this video, Stan Simpson, a water manager with the U.S. Army Corps of Engineers Savannah District, answers frequently asked questions about the Savannah River Basin Comprehensive Study. The Corps, the Georgia Department of Natural Resources, South Carolina Department of … Continue reading
Posted in Studies, Water Management
Tagged Army Corps of Engineers, comp study, comprehensive study, Environmental Assessment, Hartwell Lake, J. Strom Thurmond Lake, Richard B. Russell Lake, Russell Lake, Savannah District, Savannah River, Savannah River Basin, study, Thurmond Lake, US Army Corps of Engineers, USACE, water management, winter drawdown
Leave a comment
Corps, states, Nature Conservancy kick-off 2nd interim of Comprehensive Study
We are pleased to announce the long-awaited second portion of the Savannah River Basin Comprehensive Study has officially begun. During a bi-state water caucus meeting at Hartwell Lake Sept. 18, officials with the U.S. Army Corps of Engineers Savannah District, … Continue reading
Posted in Drought Response, Studies, Water Management, Water Quality/Water Supply
Tagged Army Corps of Engineers, Colonel Thomas Tickner, commander, comp study, comprehensive study, cost share, drought, flood control, flood risk management, GA DNR, Hartwell Lake, J. Strom Thurmond Lake, non federal sponsors, Richard B. Russell Lake, Russell Lake, Savannah District, Savannah River, Savannah River Basin, SC DNR, studies, The Nature Conservancy, Thurmond Dam, Thurmond Lake, water caucus, water management
4 Comments
Video: Corps Water Manager discusses Comprehensive Study
By Sandra Hudson, Broadcast Journalist The Savannah River Basin Comprehensive Study would provide an in-depth set of data and analysis that would allow the Corps of Engineers to understand the value, impacts and risks to proposed changes in operations of … Continue reading
An update on the Basin’s Comprehensive Study
By Russell Wicke Savannah District Corporate Communications We were recently asked to provide an update on the status of the Savannah River Basin Comprehensive Study. The Comprehensive Study is the tool the Corps will use to see if changes to … Continue reading
Corps gives update on EA and Comp Study
The U.S. Army Corps of Engineers releases water from the Hartwell, Richard B. Russell and J. Strom Thurmond reservoir system to meet upstream and downstream needs – drinking water, industrial uses, utilities, and environmental and natural resource protection. These needs … Continue reading