Subscribe
-
Recent Posts
Categories
- coronavirus
- coronavirus
- covid19
- CSS Georgia
- Declaration/Projection
- Dissolved oxygen
- Drought in the News
- Drought Response
- Fish and Wildlife
- Flood Risk Management
- From the Commander
- Guest Author
- Hydropower
- Jekyll Creek
- Navigation
- New Savannah Bluff Lock & Dam
- NPLD
- Rainfall Update
- Recreation
- Savannah Harbor
- SHEP
- Studies
- Uncategorized
- Videos
- Water Management
- Water Quality/Water Supply
- Water Safety
- WRO
- WRO
Archives
meta
Tag Archives: deepening
SHEP and the Savannah River – a Wrap-up
Editor’s note: Beginning in July 2013 this blog has posted a series of stories on the environmental monitoring of the Savannah River as part of the Savannah Harbor Expansion Project (SHEP). The monitoring program continues and some will be expanded … Continue reading →
Posted in Fish and Wildlife, Navigation, Savannah Harbor, Studies, Water Management, Water Quality/Water Supply
|
Tagged Abercorn Creek, Army Corps of Engineers, Atlantic sturgeon, chlorides, City of Savannah, Clemson University, construction, data, deepening, department of natural resources, dissolved oxygen, downstream, environmental, Environmental Assessment, estuary, fish, Garden City Terminal, Georgia, Georgia Ports Authority, GPA, intake, Monitoring, New Savannah Bluff Lock and Dam, pre-construction monitoring, research, salinity, Savannah District, Savannah Harbor, Savannah Harbor Expansion Project, Savannah River, Savannah River Basin, SC DNR, SHEP, shortnose sturgeon, South Carolina, striped bass, studies, study, transmitter, UGA, University of Georgia, upstream, US Geologi, US Geological Survey, USACE, USGS, water impoundment, water mitigation, water quality, Wetlands
|
1 Comment
Environmental monitoring underway for Savannah harbor deepening
Editors Note: This is the first in a series of articles to explain environmental monitoring efforts associated with the Savannah Harbor Expansion Project. This series will focus on the various monitoring activities that must take place before construction begins. Subsequent … Continue reading →
Posted in Navigation, Savannah Harbor, Studies, Water Quality/Water Supply
|
Tagged Abercorn Creek, Army Corps of Engineers, deepening, environmental monitoring, expansion, harbor, port, Savannah District, Savannah Harbor, Savannah River, Savannah River Basin, SHEP, shipping channel, studies, US Army Corps of Engineers, USACE
|
2 Comments