Subscribe
-
Recent Posts
Categories
- coronavirus
- coronavirus
- covid19
- CSS Georgia
- Declaration/Projection
- Dissolved oxygen
- Drought in the News
- Drought Response
- Fish and Wildlife
- Flood Risk Management
- From the Commander
- Guest Author
- Hydropower
- Jekyll Creek
- Navigation
- New Savannah Bluff Lock & Dam
- NPLD
- Rainfall Update
- Recreation
- Savannah Harbor
- SHEP
- Studies
- Uncategorized
- Videos
- Water Management
- Water Quality/Water Supply
- Water Safety
- WRO
- WRO
Archives
meta
Tag Archives: water quality
Comp Study ends: Water quality, other concerns, leave drought plan unchanged
Officials here ended the second interim of the Savannah River Basin Comprehensive Study due to inadequate analysis, a lack of full partnership concurrence on the recommendation and insufficient funding.
Dissolved oxygen injection system a ‘remarkable success’
Last week we completed the report on tests for the Hutchinson Island dissolved oxygen injection system, an environmental mitigation feature of the Savannah Harbor Expansion Project (SHEP).
Posted in Dissolved oxygen, Savannah Harbor, SHEP
Tagged Beth Williams, Col. Daniel Hibner, data, dissolved oxygen, dissolved oxygen injection system, Hutchinson Island, Savannah District, Savannah Harbor Expansion Project, Savannah River, Savannah River Basin, SHEP, studies, US Army Corps of Engineers Savannah District, USACE, water quality
Leave a comment
Study to examine effects of ‘re-bending’ Savannah River
SAVANNAH, Ga. — In the late 1800s the U.S. Army Corps of Engineers and others cut through 46 bends in the Savannah River below Augusta to aid commercial navigation. Now the Corps wants to know how these “shortcuts” have impacted … Continue reading
Corps uses grass-eating carp to tame hydrilla at Thurmond
SAVANNAH, Ga. – The U.S. Army Corps of Engineers will begin stocking sterile triploid grass carp to reduce the abundance of hydrilla in the J. Strom Thurmond Lake Oct. 25 and will run through Nov. 15.
Upper Savannah reservoirs enter Drought Level 1
SAVANNAH, Ga. – The three reservoirs on the Savannah River operated by the U.S. Army Corps of Engineers entered the first drought level today when pool elevation at Thurmond Lake dipped below 326 feet above mean sea level (ft-msl). Entering … Continue reading
Posted in Declaration/Projection, Drought in the News, Drought Response, Studies, Water Quality/Water Supply
Tagged Army Corps of Engineers, comprehensive study, declaration, Environmental Assessment, Hartwell Dam, Hartwell Lake, J. Strom Thurmond Lake, Lake Hartwell, lake levels, Lake Thurmond, outflows, projection, Richard B. Russell Lake, Russell Dam, Russell Lake, Savannah District, Savannah River, studies, Thurmond Lake, US Army Corps of Engineers, USACE, water management, water quality
Leave a comment
Commander: Persistent, below normal rainfall expected to impact lake levels
Since I took command of the Savannah District in June 2015 we’ve been fortunate to have adequate, and sometimes abundant, rainfall and inflows to maintain full reservoir levels. Beginning in January we observed below-average rainfall throughout the basin, yet were … Continue reading
Posted in Declaration/Projection, Drought in the News, Drought Response, From the Commander, Studies, Water Management, Water Quality/Water Supply
Tagged Army Corps of Engineers, comprehensive study, drought, Environmental Assessment, Hartwell Dam, Hartwell Lake, hydropower, J. Strom Thurmond Lake, Lake Hartwell, lake levels, Lake Thurmond, projection, Richard B. Russell Lake, Russell Dam, Russell Lake, Savannah District, South Carolina, study, US Army Corps of Engineers, USACE, water quality
Leave a comment
Living on borrowed rain
Now that it’s officially summer, the heat is on in more ways than one. Namely, if the trend of sub-par precipitation doesn’t improve, the basin could enter drought level 1 before August. That same trajectory would bring us to drought … Continue reading
Posted in Declaration/Projection, Drought in the News, Drought Response, Rainfall Update, Water Management
Tagged Army Corps of Engineers, comprehensive study, declaration, drought, Hartwell Lake, J. Strom Thurmond Lake, Lake Thurmond, rainfall, Richard B. Russell Lake, Russell Dam, Savannah District, Savannah River Basin, USACE, water management, water quality
Leave a comment
Listening to the pulse of the Savannah River
A soft breeze rustled the marsh grasses as James “Jim” Rothnie carefully placed a fresh canvas on his easel. Morning light sparkled on the waters of the ACE Basin nearby. Quietly, he crept closer to the dozen lounging birds, their … Continue reading
Posted in Drought Response, Fish and Wildlife, Flood Risk Management, Guest Author, Savannah Harbor, Studies, Water Management, Water Quality/Water Supply
Tagged Army Corps of Engineers, drought, flood control, hydropower, lake levels, projection, Savannah Harbor Expansion Project, Savannah River, Savannah River Basin, South Carolina, study, The Nature Conservancy, water management, water quality
Leave a comment
Workers prepare site for dissolved oxygen system
SAVANNAH, Ga. – Just like a nurse who swabs an arm before injecting vaccine into a patient, workers began clearing debris and underbrush from land set to house dissolved oxygen injection equipment for the Savannah River.